Digital Wireline Logs for Chi 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Chi 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,521 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,521 m
- Datum Elevation
- -
- Spud Date
- 14/01/2010
- Completion Date
- 28/01/2010
- Permit
- ATP 259 P
- Rig
- Rig 18
Location
- Latitude
- -28.3433
- Longitude
- 141.4660