Digital Wireline Logs for Endeavour 7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Endeavour 7 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,457 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,457 m
- Datum Elevation
- 188.0 m
- Spud Date
- 17/06/2006
- Completion Date
- 28/06/2006
- Permit
- PL 57
- Rig
- Rig 724
Location
- Latitude
- -26.7947
- Longitude
- 143.3820