Digital Wireline Logs for Fleetwood 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fleetwood 1 in the Eromanga, Queensland, operated by Enron, drilled to a total depth of 1,237 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,237 m
- Datum Elevation
- -
- Spud Date
- 04/05/93
- Completion Date
- 27/06/93
- Permit
- EPP529
- Rig
- -
Location
- Latitude
- -22.1086
- Longitude
- 145.8510