Digital Wireline Logs for Gimboola 5
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Gimboola 5 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,389 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,389 m
- Datum Elevation
- 174.9 m
- Spud Date
- 16/05/2006
- Completion Date
- 19/05/2006
- Permit
- PL 169
- Rig
- Rig 735
Location
- Latitude
- -26.8774
- Longitude
- 143.4150