Digital Wireline Logs for Huckleberry 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Huckleberry 2 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,373 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,373 m
- Datum Elevation
- 173.0 m
- Spud Date
- 14/02/2007
- Completion Date
- 20/02/2007
- Permit
- ATP 299P
- Rig
- Rig 735
Location
- Latitude
- -28.8874
- Longitude
- 143.3720