Digital Wireline Logs for Iliad 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Iliad 3 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,387 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,387 m
- Datum Elevation
- 132.2 m
- Spud Date
- 23/04/2005
- Completion Date
- 01/05/2005
- Permit
- PL 34
- Rig
- Rig 18
Location
- Latitude
- -28.2930
- Longitude
- 141.3640