Digital Wireline Logs for Juno 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Juno 2 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 2,835 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,835 m
- Datum Elevation
- -
- Spud Date
- 11/04/1998
- Completion Date
- 09/05/1998
- Permit
- EPP259
- Rig
- -
Location
- Latitude
- -27.6897
- Longitude
- 141.8270