Digital Wireline Logs for Mimosa 1 - Ero
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mimosa 1 - Ero in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,458 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,458 m
- Datum Elevation
- 186.2 m
- Spud Date
- 01/05/2006
- Completion Date
- 09/05/2006
- Permit
- ATP 299P
- Rig
- Rig 724
Location
- Latitude
- -26.7978
- Longitude
- 143.3650