Digital Wireline Logs for Sable 1 - Ero
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Sable 1 - Ero in the Eromanga, Queensland, operated by Tamark, drilled to a total depth of 2,203 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,203 m
- Datum Elevation
- -
- Spud Date
- 28/12/2000
- Completion Date
- 12/01/2001
- Permit
- ATP 541 P
- Rig
- OD & E W/O-4
Location
- Latitude
- -25.0364
- Longitude
- 142.5200