Digital Wireline Logs for Thungo 13
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thungo 13 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,138 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,138 m
- Datum Elevation
- 113.0 m
- Spud Date
- 24/12/2006
- Completion Date
- 09/01/2007
- Permit
- PL 51
- Rig
- Rig 721
Location
- Latitude
- -27.6673
- Longitude
- 142.5810