Digital Wireline Logs for Thungo 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Thungo 9 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,390 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,390 m
- Datum Elevation
- 112.0 m
- Spud Date
- 11/12/2006
- Completion Date
- 17/12/2006
- Permit
- PL 51
- Rig
- Rig 721
Location
- Latitude
- -27.7246
- Longitude
- 142.5830