Digital Wireline Logs for Tooten 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Tooten 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 231 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 231 m
- Datum Elevation
- 179.5 m
- Spud Date
- 13/08/2006
- Completion Date
- 14/08/2006
- Permit
- ATP 299 P / PL 57
- Rig
- Rig 721
Location
- Latitude
- -26.8089
- Longitude
- 143.3960