Digital Wireline Logs for Whynot 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Whynot 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,423 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,423 m
- Datum Elevation
- 176.0 m
- Spud Date
- 03/07/2006
- Completion Date
- 13/07/2006
- Permit
- ATP 299 P
- Rig
- Rig 721
Location
- Latitude
- -26.8236
- Longitude
- 143.4040