Skip to content

Wompi 1

Eromanga, Queensland

Wompi 1 is a petroleum well in the Eromanga, Queensland, operated by Delhi, drilled to a total depth of 1,844 m.

Request LAS Files & Well Summary

Well Information

Well Name
Wompi 1
Basin
Eromanga
State
Queensland
Classification
NEST
Operator
Delhi
Driller
ODE

Drilling Data

Total Depth
1,844 m
Datum Elevation
104.0 m
Spud Date
12/01/1988
Completion Date
26/01/1988
Permit
-
Rig
Rig 18

Location

Latitude
-28.2835
Longitude
141.6850

Available Log Data

1
Log Streams
15
Curves
160,214
Data Points
24,417
Metres

Caliper (2 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 228 m 1827 m 1598 m
CALS 228 m 1822 m 1594 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
DRHO 230 m 1827 m 1596 m
PEF 230 m 1827 m 1596 m
RHOB 230 m 1827 m 1596 m

GR (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 3 m 1815 m 1812 m

Miscellaneous (1 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 3 m 1837 m 1834 m

Resistivity (5 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
LLD 230 m 1831 m 1601 m
LLG 230 m 1831 m 1601 m
LLS 230 m 1831 m 1601 m
MSFC 230 m 1822 m 1591 m
MSFL 230 m 1822 m 1591 m

Sonic (2 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
LDTL 228 m 1837 m 1609 m
LSDT 227 m 1837 m 1610 m

SP (1 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SP 230 m 1809 m 1579 m