Digital Wireline Logs for Yanda 10
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Yanda 10 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 2,476 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,476 m
- Datum Elevation
- 124.0 m
- Spud Date
- 27/01/1997
- Completion Date
- 16/02/1997
- Permit
- -
- Rig
- Rig 18
Location
- Latitude
- -27.4633
- Longitude
- 141.7830