Digital Wireline Logs for Fairview 29
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 29 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 919 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 919 m
- Datum Elevation
- 601.5 m
- Spud Date
- 04/03/2000
- Completion Date
- 17/03/2000
- Permit
- PL 90
- Rig
- Rig 2
Location
- Latitude
- -25.5376
- Longitude
- 148.8670