Digital Wireline Logs for Fairview 31
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 31 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 672 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 672 m
- Datum Elevation
- 379.0 m
- Spud Date
- 21/03/2000
- Completion Date
- 07/04/2000
- Permit
- PL 99
- Rig
- Rig 2
Location
- Latitude
- -25.7821
- Longitude
- 148.9660