Digital Wireline Logs for Fairview 49
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fairview 49 in the Surat, Queensland, operated by Tri Star, drilled to a total depth of 804 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 804 m
- Datum Elevation
- 496.3 m
- Spud Date
- 24/10/2000
- Completion Date
- 17/11/2000
- Permit
- PL 91
- Rig
- Rig 2
Location
- Latitude
- -25.6238
- Longitude
- 148.9180