Digital Wireline Logs for Billeroo West 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Billeroo West 1 in the Arrowie, South Australia, operated by Minad, drilled to a total depth of 600 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 600 m
- Datum Elevation
- 62.8 m
- Spud Date
- 4/09/1980
- Completion Date
- 25/04/1981
- Permit
- EL 722
- Rig
- -
Location
- Latitude
- -31.2609
- Longitude
- 140.1270