Digital Wireline Logs for Emu Dam 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Emu Dam 1 in the Arrowie, South Australia, operated by Minad, drilled to a total depth of 542 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 542 m
- Datum Elevation
- 71.9 m
- Spud Date
- 6/09/1980
- Completion Date
- 31/05/1981
- Permit
- EL 911
- Rig
- -
Location
- Latitude
- -31.4260
- Longitude
- 140.2420