Digital Wireline Logs for Dirkala 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Dirkala 4 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,109 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,109 m
- Datum Elevation
- 32.0 m
- Spud Date
- 10/01/1999
- Completion Date
- 22/01/1999
- Permit
- PEL 5and6 Pat E
- Rig
- Rig 32
Location
- Latitude
- -28.5123
- Longitude
- 140.0350