Digital Wireline Logs for Marabooka 15
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Marabooka 15 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,122 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,122 m
- Datum Elevation
- 56.8 m
- Spud Date
- 29/08/2008
- Completion Date
- 3/09/2008
- Permit
- PPL 22
- Rig
- -
Location
- Latitude
- -28.2019
- Longitude
- 140.6350