Digital Wireline Logs for Moolion 4
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moolion 4 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 3,052 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,052 m
- Datum Elevation
- 42.6 m
- Spud Date
- 18/02/2006
- Completion Date
- 08/03/2006
- Permit
- PPL 167
- Rig
- Rig 32
Location
- Latitude
- -27.4050
- Longitude
- 140.2150