Digital Wireline Logs for Moomba 145
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 145 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,773 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,773 m
- Datum Elevation
- 43.7 m
- Spud Date
- 10/06/2001
- Completion Date
- 25/06/2001
- Permit
- PPL 7
- Rig
- Rig 32
Location
- Latitude
- -28.0235
- Longitude
- 140.2470