Digital Wireline Logs for Moomba 155
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 155 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,783 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,783 m
- Datum Elevation
- 45.4 m
- Spud Date
- 18/05/2002
- Completion Date
- 30/05/2002
- Permit
- PPL 7
- Rig
- Rig 32
Location
- Latitude
- -28.0841
- Longitude
- 140.3070