Digital Wireline Logs for Moomba 174
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 174 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 2,105 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,105 m
- Datum Elevation
- 35.6 m
- Spud Date
- 15/07/2003
- Completion Date
- 23/07/2003
- Permit
- PPL 9
- Rig
- Rig 18
Location
- Latitude
- -28.2328
- Longitude
- 140.2370