Digital Wireline Logs for Moomba 99
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Moomba 99 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,024 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,024 m
- Datum Elevation
- 38.0 m
- Spud Date
- 02/04/1998
- Completion Date
- 13/04/1998
- Permit
- PPL 8
- Rig
- Rig 32
Location
- Latitude
- -28.1173
- Longitude
- 140.1280