Digital Wireline Logs for Parham 1
Quote within 1 business day
Priced per curve-metre, capped at $2,000 per well
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Parham 1 in the Cooper, South Australia, operated by Beach, drilled to a total depth of 1,826 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,826 M
- Datum Elevation
- -
- Spud Date
- 01/05/2011
- Completion Date
- 09/05/2011
- Permit
- PEL 92
- Rig
- Rig 30
Location
- Latitude
- -28.0294
- Longitude
- 139.2690