Digital Wireline Logs for Parsons 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Parsons 3 in the Cooper, South Australia, operated by Beach, drilled to a total depth of 1,412 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,412 M
- Datum Elevation
- -
- Spud Date
- 23/02/2011
- Completion Date
- 02/03/2011
- Permit
- PEL 92
- Rig
- Rig 30
Location
- Latitude
- -27.9557
- Longitude
- 139.2830