Digital Wireline Logs for Pira 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Pira 3 in the Cooper, South Australia, operated by Santos, drilled to a total depth of 2,682 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,682 m
- Datum Elevation
- 82.0 m
- Spud Date
- 02/03/2005
- Completion Date
- 19/03/2005
- Permit
- -
- Rig
- Rig 32
Location
- Latitude
- -28.2051
- Longitude
- 140.8850