Digital Wireline Logs for Westall 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Westall 1 in the Cooper, South Australia, operated by Beach, drilled to a total depth of 1,808 M. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,808 M
- Datum Elevation
- 37.2 m
- Spud Date
- 13/06/2011
- Completion Date
- 19/06/2011
- Permit
- PEL 92
- Rig
- Rig 30
Location
- Latitude
- -27.9843
- Longitude
- 139.2580