Digital Wireline Logs for Worrior 3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Worrior 3 in the Cooper, South Australia, operated by Stuart, drilled to a total depth of 1,791 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,791 m
- Datum Elevation
- 45.0 m
- Spud Date
- 12/09/2005
- Completion Date
- 23/09/2005
- Permit
- PEL 207
- Rig
- Rig 3
Location
- Latitude
- -28.4143
- Longitude
- 139.8090