Digital Wireline Logs for Bilberry 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bilberry 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,396 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,396 m
- Datum Elevation
- 169.0 m
- Spud Date
- 03/06/2006
- Completion Date
- 15/06/2006
- Permit
- -
- Rig
- Rig 721
Location
- Latitude
- -26.8484
- Longitude
- 143.3840