Digital Wireline Logs for Bingilberry 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Bingilberry 1 in the Eromanga, Queensland, operated by Santos, drilled to a total depth of 1,437 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,437 m
- Datum Elevation
- 174.0 m
- Spud Date
- 14/10/2006
- Completion Date
- 23/10/2006
- Permit
- PL 29
- Rig
- Rig 735
Location
- Latitude
- -26.8202
- Longitude
- 143.3940