Skip to content

Digital Wireline Logs for Bugito 1

Ready for Instant Purchase Workstation-Ready LAS · QC'd · Composite

Eromanga, South Australia

Quality-controlled, spliced, and depth-matched wireline log data for Bugito 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,603 m. Ready for immediate petrophysical analysis.

Request LAS Files & Well Summary

Well Information

Well Name
Bugito 1
Basin
Eromanga
State
South Australia
Classification
NEST
Operator
Santos
Driller
ODE

Drilling Data

Total Depth
1,603 m
Datum Elevation
32.7 m
Spud Date
15/07/2005
Completion Date
21/082005
Permit
-
Rig
Rig 20

Location

Latitude
-28.5514
Longitude
140.2890