Digital Wireline Logs for Caroowinnie 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Caroowinnie 1 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,705 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,705 m
- Datum Elevation
- 52.6 m
- Spud Date
- 18/03/2007
- Completion Date
- 29/03/2007
- Permit
- -
- Rig
- Rig 20
Location
- Latitude
- -28.4957
- Longitude
- 140.6990