Skip to content

Charo 3

Eromanga, South Australia

Charo 3 is a petroleum well in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,901 m.

Request LAS Files & Well Summary

Well Information

Well Name
Charo 3
Basin
Eromanga
State
South Australia
Classification
NAFE
Operator
Santos
Driller
PDI

Drilling Data

Total Depth
1,901 m
Datum Elevation
30.0 m
Spud Date
15/11/2007
Completion Date
05/12/2007
Permit
PPL 177
Rig
Rig 724

Location

Latitude
-27.4415
Longitude
139.7210

Available Log Data

2
Log Streams
47
Curves
518,175
Data Points
56,600
Metres

Other (6 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CNCDL 1341 m 1871 m 530 m
CNCFDL 1341 m 1871 m 530 m
CNCFLS 1341 m 1871 m 530 m
CNCFSS 1341 m 1871 m 530 m
CNCLS 1341 m 1871 m 530 m
CNCSS 1341 m 1871 m 530 m

Caliper (4 curves)

Borehole diameter measurements indicating hole condition and washout zones.

Curve Start End Interval
CALI 622 m 1902 m 1279 m
CALX 624 m 1902 m 1277 m
CALX 624 m 1869 m 1245 m
CALY 624 m 1902 m 1277 m

Chromato (7 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ETHA 763 m 1893 m 1129 m
IBUT 907 m 1900 m 993 m
IPEN 1048 m 1900 m 851 m
METH 4 m 1900 m 1895 m
NBUT 1047 m 1900 m 852 m
NPEN 1048 m 1900 m 851 m
PROP 4 m 1895 m 1891 m

Density (3 curves)

Bulk density measurements for porosity calculation and lithology identification.

Curve Start End Interval
PEF 1341 m 1874 m 533 m
ZCOR 1341 m 1871 m 530 m
ZDNC 1341 m 1871 m 530 m

GR (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
GR 13 m 1868 m 1855 m
GRUF 12 m 1869 m 1856 m

Logging Parameters (2 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
CHT 623 m 1903 m 1280 m
TEN 623 m 1905 m 1282 m

Miscellaneous (4 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
DEPTH 4 m 1900 m 1895 m
DEPTH 12 m 1905 m 1893 m
MFIN 4 m 1900 m 1895 m
SPD 623 m 1905 m 1282 m

Mudlog (8 curves)

Well log curves recorded during wireline logging operations.

Curve Start End Interval
ROP 4 m 1900 m 1895 m
RPM 4 m 1900 m 1895 m
SPP 4 m 1900 m 1895 m
TGAS 814 m 1900 m 1086 m
TORQ 4 m 1900 m 1895 m
TTEN 623 m 1905 m 1282 m
WOB 4 m 1900 m 1895 m
WP 587 m 1868 m 1280 m

Neutron (3 curves)

Porosity measurements derived from neutron or density tools, indicating reservoir storage capacity.

Curve Start End Interval
CN 1341 m 1871 m 530 m
CNC 1341 m 1871 m 530 m
CNCF 1341 m 1871 m 530 m

Resistivity (5 curves)

Electrical resistivity logs used to evaluate fluid content and identify hydrocarbon-bearing zones.

Curve Start End Interval
RD 645 m 1895 m 1249 m
RMLL 645 m 1902 m 1257 m
RS 645 m 1895 m 1249 m
WRM 585 m 1865 m 1280 m
WTBH 585 m 1865 m 1280 m

Sonic (1 curves)

Acoustic travel time logs used for porosity estimation and seismic calibration.

Curve Start End Interval
DT24 377 m 1881 m 1503 m

SP (2 curves)

Spontaneous potential logs measuring natural electrical potentials for permeability indication.

Curve Start End Interval
SPSB 579 m 1862 m 1282 m
SPSBDH 645 m 1860 m 1215 m