Digital Wireline Logs for Hobbes 2
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hobbes 2 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,568 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,568 m
- Datum Elevation
- 44.5 m
- Spud Date
- 29/10/2009
- Completion Date
- 4/11/2009
- Permit
- PPL 234
- Rig
- -
Location
- Latitude
- -28.4631
- Longitude
- 140.4600