Digital Wireline Logs for Ulandi 9
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Ulandi 9 in the Eromanga, South Australia, operated by Santos, drilled to a total depth of 1,321 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,321 m
- Datum Elevation
- 35.6 m
- Spud Date
- 11/07/2003
- Completion Date
- 17/07/2003
- Permit
- PPL 149
- Rig
- Rig 34
Location
- Latitude
- -28.5345
- Longitude
- 140.3140