Digital Wireline Logs for Hollick 1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Hollick 1 in the Otway, South Australia, operated by Adelaide, drilled to a total depth of 2,980 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,980 m
- Datum Elevation
- 60.8 m
- Spud Date
- 4/03/2010
- Completion Date
- 14/04/2010
- Permit
- PEL 255
- Rig
- Rig 2
Location
- Latitude
- -37.3501
- Longitude
- 140.7530