Digital Wireline Logs for Cobia F13
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Cobia F13 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,286 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,286 m
- Datum Elevation
- 32.4 m
- Spud Date
- 22/12/1983
- Completion Date
- 15/01/1984
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4493
- Longitude
- 148.3090