Digital Wireline Logs for Flounder A19
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Flounder A19 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 4,548 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 4,548 m
- Datum Elevation
- 34.2 m
- Spud Date
- 16/10/1986
- Completion Date
- 09/12/1986
- Permit
- -
- Rig
- Nat 110DE Rig 10
Location
- Latitude
- -38.3125
- Longitude
- 148.4380