Digital Wireline Logs for Flounder A3
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Flounder A3 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,148 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,148 m
- Datum Elevation
- 34.2 m
- Spud Date
- 22/10/1984
- Completion Date
- 21/11/1984
- Permit
- -
- Rig
- -
Location
- Latitude
- -38.3125
- Longitude
- 148.4380