Digital Wireline Logs for Flounder A4B
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Flounder A4B in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,788 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,788 m
- Datum Elevation
- 40.8 m
- Spud Date
- 30/04/1999
- Completion Date
- 20/05/1999
- Permit
- -
- Rig
- -
Location
- Latitude
- -38.3100
- Longitude
- 148.4400