Digital Wireline Logs for Fortescue A23H ST1
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Fortescue A23H ST1 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,687 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,687 m
- Datum Elevation
- 39.6 m
- Spud Date
- 28/11/1995
- Completion Date
- 30/12/1995
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4071
- Longitude
- 148.2780