Digital Wireline Logs for Halibut A18A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Halibut A18A in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,900 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,900 m
- Datum Elevation
- 29.3 m
- Spud Date
- 14/10/1999
- Completion Date
- 13/11/1999
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4041
- Longitude
- 148.3200