Digital Wireline Logs for Halibut A24
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Halibut A24 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 2,997 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 2,997 m
- Datum Elevation
- 29.4 m
- Spud Date
- 07/01/2007
- Completion Date
- 31/01/2007
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4042
- Longitude
- 148.3200