Digital Wireline Logs for Halibut A6A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Halibut A6A in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,474 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,474 m
- Datum Elevation
- 29.4 m
- Spud Date
- 24/11/2003
- Completion Date
- 16/12/2003
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4041
- Longitude
- 148.3200