Digital Wireline Logs for Mackerel A2A
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Mackerel A2A in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 3,534 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 3,534 m
- Datum Elevation
- 33.8 m
- Spud Date
- 23/02/1993
- Completion Date
- 27/03/1993
- Permit
- VIC L 5
- Rig
- -
Location
- Latitude
- -38.4792
- Longitude
- 148.3430