Digital Wireline Logs for Marlin A7
Ready for Instant Purchase
Workstation-Ready LAS · QC'd · Composite
Quality-controlled, spliced, and depth-matched wireline log data for Marlin A7 in the Gippsland, Victoria, operated by Esso, drilled to a total depth of 1,480 m. Ready for immediate petrophysical analysis.
Well Information
Drilling Data
- Total Depth
- 1,480 m
- Datum Elevation
- 27.4 m
- Spud Date
- 06/11/1968
- Completion Date
- 21/11/1969
- Permit
- VIC L 3
- Rig
- -
Location
- Latitude
- -38.2303
- Longitude
- 148.2210